The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
key technical issues of tgp permanent shiplock
Author(s): 
Pages: 57-61,71
Year: Issue:  1
Journal: Engineering Sciences

Keyword:  GetLinkList(KeywordFilter('navigation structures water conveyance system high and steep slope hydraulics')'kw''CJFQ');
Abstract: To solve the high dam navigation issue of a world class project is one of the key technical issues that bring many difficulties upon the Three Gorges Project (TGP). Special requirements exist in the TGP double lane five step shiplock in terms of a general layout of navigation structures, a sedimentation hindrance to navigation, hydraulics of the water conveyance system, treatment of high and steep slopes, the manufacture and technology of both main metal structures and mechanical and electric equipment, all of which have been resolved step by step by means of scientific tests, verification and engineering practice.
Related Articles
No related articles found