The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit
later.
We apologize for any inconvenience caused
Fenhe River Park
Pages: 27
Year: 2001
Issue:
S1
Journal: Shanxi Today
Keyword: GetLinkList(KeywordFilter('汾河:6619; 橡胶坝:5015; 污水处理厂:2518; 广场:2084; 太原市:1923; 地域文化:1916; 文明对话:1894; 蓄水美化:1830; 无障碍通道:1775; 体育健身:1698'); 'kw'; 'CJFQ');
Abstract: The first phase of Fenhe River Park(6kilometersbeginningat155metersupstreamfromthe VictoryBridge and endingat125meters downstream beyondthe SouthernRingBridge)was built between October1998and September2000.Withan investmentof560millionyuan,the Fenhe RiverPark is concurrentlya water-retainingproject to beautifythe Fenhe Riversectionthat flowsthroughthe cityproper.A concrete wall builtinto the excavated riverbed dividesthe riverintotwo channels:on the east side is the220-meter-wide channel of clear water with4rubber dams to store the water at three levels while on the west the80-meter-wide channel for muddy water to drain the upstream floodwateror channel water for irrigation.Additionallythe Fenhe River Park is the largest and most concentrated green belt for public recreation.
Citations
No citation information