phase rolled compacted concrete cofferdam construction
Author(s): 
Pages: 91-93
Year: Issue:  1
Journal: Engineering Sciences

Keyword:  GetLinkList(KeywordFilter('TGP RCC cofferdam concrete')'kw''CJFQ');
Abstract: Phase Ⅲ Rolled Compacted Concrete(RCC) cofferdam construction belongs to Phase Ⅲ diversion works. It is a key item to ensure an achievement in the reservoir impoundment, navigation and power generation in 2003 and a guarantee to the safety construction of the follow up right bank intake dam section and the powerhouse. Restrained by conditions for construction, navigation, the worksite and the duration, both the concreting intensity and the height of Phase Ⅲ RCC cofferdam exceed the current construction level. In view of these difficulties, a great deal of research work performed by relevant departments is described in the paper.
Related Articles
No related articles found