The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
technical breakthroughs in the construction of tgp
Author(s): 
Pages: 8-14,98
Year: Issue:  1
Journal: Engineering Sciences

Keyword:  GetLinkList(KeywordFilter('river closure cutoff wall high slope steel lined reinforced concrete temperature and pressure maintenance asphalt concrete core wall turbine generating units')'kw''CJFQ');
Abstract: The huge Three Gorges Project is technically complex. Quite a lot of technical breakthroughs have been made in such issues as river closure of the Grand Channel and the concrete construction of the cutoff wall, prompt concrete construction of the dam, high slope construction of the permanent shiplock, the large scale steel lined reinforced concrete penstocks of the power station, and the temperature and pressure maintenance of the spiral case, the asphalt concrete core wall, the metal works of the shiplock, and turbine generating units.
Related Articles
No related articles found