A Construction Case of Coal Mine Large Scale Frame Installation
Author(s): 
Pages: 165-167
Year: Issue:  7
Journal: Chinese and Overseas Architecture

Abstract: 湖南华菱涟钢焦化煤场网架纵轴长420m,两连跨宽111m;跨间居中安装两条纵向通长的皮带运输机和斗轮堆取料机:网架开始安装时,场内已经有50%左右的地面已经堆煤,皮带运输机和斗轮堆取料机已经投入生产:本文针对煤场安装与生产同步进行时这一比较特殊施工环境,如何组织施工,采用什么样的施工工法,作了比较详细的介绍.该施工工法经实践证明,适应于大型煤场的网架安装.