STUDY ON THE PROBLEM OF BOILER INADEQUATE CAPACITY AND PROGRAMS ABOUT BAO DIAN PLANT
Author(s): 
Pages: 81-82
Year: Issue:  1
Journal: Coal Mine Modernization

Keyword:  锅炉容量供暖发电方案;
Abstract: 华聚能源鲍店电厂由3×35T/h及1×75T/h四台锅炉组成,总装机容量为18MW(3×6MW),其中2#、3#炉共用一台静电除尘器,负责鲍店矿的供电、供暖任务,由于锅炉容量不足,不能保证正常的供暖、发电,急需新建一台75T/h,但厂区空间不足,本文针对鲍店电厂锅炉容量不足问题以及方案进行了研究.