Control of Interstratified Compaction Connection of RCC of Yuanmanguan Hydropower Station & Analysis of Results of Dam Core Sample
Author(s): CHEN Gang, HOU Xuehua
Pages: 36-
39
Year: 2010
Issue:
1
Journal: Guizhou Water Power
Abstract: 碾压混凝土层间碾压结合的质量直接影响到碾压浇筑的坝体是否成为一个整体以及层面是否会形成渗漏通道的重要因素,是碾压混凝土施工质量最基本的体现形式和成果标准.本文通过对圆满贯水电站碾压混凝土拱坝施工中的层间结合控制情况及坝体取芯的成果分析对大坝防渗及整体稳定进行了综合评价.