The Construction of the Concrete Face Rock-fill Dam Embankment of the Longma Hydropower Project
Author(s): 
Pages: 38-42
Year: Issue:  1
Journal: Yunnan Water Power

Keyword:  龙马水电站混凝土面板堆石坝坝体填筑;
Abstract: 混凝土面板堆石坝因其具有充分利用当地材料、投资少、施工快速方便等优点,发展速度较快,随着混凝土面板堆石坝设计的进步,在混凝土面板堆石坝施工过程中,新工艺、新方法得到推广和运用.文章通过对龙马水电站135 m高混凝土面板堆石坝施工,总结了堆石坝坝体填筑施工的经验和体会,供设计施工中参考.