Design of Blocking for PhaseⅠReclamation Project near Luzhong Bay in Cixi
Author(s): 
Pages: 17-19
Year: Issue:  6
Journal: Zhejiang Hydrotechnics

Abstract: 陆中湾两侧围涂工程围涂总规模3 900 hm2,一期工程小塘泥芯坝的堵口闭气已于2008年12月完成.对堵口工程设计(主要包括龙口布置和防护的确定、堵口时间的选择、堵口前的准备、有序实施以及堵口的合理资源配置等内容)作了介绍.