Construction Organization and Management of Fine Decoration at Jintaixizhao Station and Guomao Station in Beijing Metro #10 Line
Author(s): Qi Gang
Pages: 262
Year: 2008
Issue:
12
Journal: Railway Standard Design
Keyword: 北京地铁10号线; 地铁车站; 精装修; 施工组织; 管理;
Abstract: 北京地铁10号线国贸站、金台夕照站施工期间存在工期紧,质量标准要求高,施工工艺复杂,施工条件恶劣,成品保护困难等诸多困难.介绍两站精装修施工人员组织管理、机具设备和材料管理、施工作业面及场地管理、进度控制管理等内容.在极端不利的条件下,确保工程保质、保量按时完成.