The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
Full-bridge alignment measuring for Caiyuanba Yangtze river bridge loading test
Author(s): 
Pages: 63-66
Year: Issue:  4
Journal: Geotechnical Investigation & Surveying

Keyword:  loading test; connecting pipe; deflection; full-bridge alignmen ;
Abstract: It is very important to acquire deflection of full-bridge alignment in large span bridge load test.In order to overcome the defect that Total Station can not obtain the deflection of full-bridge alignment,the connecting pipe principle deflection measurement system is adopted to implement multi-point synchronous measurements.As a result,bridge alignment is gained.Caiyuanba Yangtze River Bridge load test results have been demonstrated the effectiveness of the proposed method.
Related Articles
No related articles found