The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
Study on the pile deformation control of bridge head soft foundation treated by vacuum combined with surcharge preloading
Author(s): 
Pages: 26-31
Year: Issue:  4
Journal: Geotechnical Investigation & Surveying

Keyword:   vacuum preloading; surcharge preloading; drive cast-place-pile; deformation; dynamic control ;
Abstract:  To apply vacuum combined with surcharge preloading on the bridge head soft soil drive cast-place-piles constructed,the control of the pile displacement is the crucial point.Study analysis shows that pile displacement can be effectively controlled if the constructed drive cast-place-piles are included in the vacuum preloading area and vacuity & embankment load are adjusted dynamically.Compared to the embankment load and horizontal force above the pile,the vacuum load has less influence on the pile under the same load intensity,and the mechanic law of the pile can be analyzed with "m" method.To reduce the displacement of the pile constructed and the construction difficulty,the drive cast-place-pile should be constructed before the vacuum preloading if the condition is allowed.
Related Articles
No related articles found