Application and Practice of Gas -steam Combined Cycle Power Train Generating Technology in Qinghai Power Grid
Author(s): 
Pages: 16-20
Year: Issue:  3
Journal: QINGHAI ELECTRIC POWER

Keyword:  燃气-蒸汽联合循环调试应用;
Abstract: 针对燃气轮机结构、设备和热力系统及运行控制与火电机组差异大、机组自动化技术水平比较高的特点,在机组调试过程中大胆创新,改进调试工作程序和流程及调试方法,对调试工作中遇到的技术难点和问题进行认真研究分析,成功解决了燃煤机组调试中不曾出现的疑难问题.经过现场的摸索、实践,解决了高海拔地区燃机调试中的关键技术难题,为今后的燃气-蒸汽联合循环在高海拔地区的应用和实践提供了借鉴.