Optimization of Construction Loading Procedures for Five-Span Continuous Concrete-Filled Steel Tube Tied Arch Bridge
Author(s): 
Pages: 45-47
Year: Issue:  2
Journal: WORLD BRIDGES

Keyword:  钢管混凝土拱桥桥梁施工程序优化;
Abstract: 以潮州市韩江北桥(五连跨钢管混凝土拱桥)施工为例,提出在坚持基本对称加载的原则下通过计算分析论证,对施工加载程序进行优化调整的方案.计算表明该优化缩短了工期,具有明显的社会效益和经济效益,对同类桥梁的施工有较好的借鉴作用.