Research on Power Supply Scheme Based on Partitioning of 500/220kV Tianjin Power Grid During the 11th Five-Year Plan
Author(s): 
Pages: 51-55
Year: Issue:  9
Journal: POWER SYSTEM TECHNOLOGY

Keyword:  天津电网电网规划电网分区电磁环网短路电流潮流计算;
Abstract: 论述了天津电网分区供电的必要性和分区供电方案的计算分析方法,结合天津电网"十一五"期间500 kV和220 kV输变电工程的建设项目,重点研究了2009年天津500 kV/220 kV电磁环网的运行方式,通过计算和分析电网的电力平衡关系、短路电流、潮流并进行稳定校核,指出了电磁环网运行存在的问题,提出了分区供电方案,并对天津电网的网架规划和建设过程中存在的问题提出了建议,以期为天津电网"十一五"期间的分区供电研究工作提供参考.