Start-up Characteristic of MP Cylinder and Analysis of its Cutting Operation in Introduced 330MW Steam Turbine
Author(s): 
Pages: 63-67
Year: Issue:  3
Journal: GUANGXI ELECTRIC POWER

Keyword:  330 MW汽轮机中压缸启动切缸条件切缸对策;
Abstract: 为了能在机组寿命不受影响的基础上快速而安全地启动机组,文章探讨了中压缸启动的过程及切缸过程,并分析了不能自动切缸的原因,针对因温度条件不满足而不能自动切缸的问题,提出了相应的解决对策及切缸过程的注意事项,可为同类型机组的启动提供参考.