THE REASON ANALYSIS OF FORMING STOMACH PLANK CRACK DURING 40-METER T BEAM PREFABRICATE CONSTRUCTION
Author(s): 
Pages: 214-216
Year: Issue:  z1
Journal: GUIZHOU SCIENCE

Keyword:  T梁腹板裂缝预制施工;
Abstract: 我省某公路桥梁,上部结构为40m跨径T梁.预支施工时发生了腹板开裂的问题,笔者参与了设计和施工处理,本文从结构设计、施工方面分析探讨了问题产生的原因,并结合问题的解决提出了一些建议,仅供设计施工参考.