Test of optimization of open diversion channel exit and downstream protection in Tongzilin water power station
Author(s): 
Pages: 62-64
Year: Issue:  6
Journal: WATER RESOURCES & HYDROPOWER OF NORTHEAST CHINA

Keyword:  导流明渠体型优化桐子林水电站;
Abstract: 通过水工模型试验对桐子林二期导流明渠水流归槽情况、下游及围堰堰脚保护措施进行了研究.试验结果表明,通过优化出口体型后,采用钢筋石笼护底、混凝土四面体加糙的工程措施,改善了下游河道和堰脚的水流条件,达到了设计要求.