Mid and Long Term Contract Scheduling of Hydro-thermal Power System During Electricity Market Interim
Author(s): 
Pages: 6-9
Year: Issue:  3
Journal: HYDROPOWER AUTOMATION AND DAM MONITORING

Keyword:  合同计划合同分解等备用水火电系统电力市场;
Abstract: 探讨了如何按发电计划进行电厂合同电量分解的优化运行的问题,建立了综合考虑年度各月、各日、各时段的负荷曲线变化以及各电厂合同电量、电厂出力限制等运行约束条件的数学模型,并提出了利用水火电的不同特点解决该问题的新方法,该方法已在实际中应用.运行计算结果表明所提出的模型和方法是有效的.