Design and Realization of Joint Control and Regulation Functions for Tianlonghu-Jinlongtan Cascade Hydropower Stations and Their Realization
Author(s): 
Pages: 13-15,46
Year: Issue:  3
Journal: HYDROPOWER AUTOMATION AND DAM MONITORING

Keyword:  梯级水电站联合控制调节工况功能设计;
Abstract: 梯级水电站的控制必须考虑电力平衡、水量平衡、站间通信、区间径流、流达时间、尾水衔接等问题.金龙潭-天龙湖梯级电站的特殊性在于,2个电站之间仅通过无压隧洞过渡,设计与实现这2个电站的联合控制调节功能较复杂.文中主要介绍了实现联合控制调节功能的监控系统基础、不同工况下的功能设计以及联合控制调节的功能实现.