The Red River bridge filling pile submarine demolition plan determination and the construction
Author(s): 
Pages: 98-99
Year: Issue:  6
Journal: CHINA WATER TRANSPORT(ACADEMIC VERSION)

Keyword:  水下灌注桩套箱法拆除;
Abstract: 水下工程的施工采用不同的方案,会产生不同的难易程度和经济后果.本文以红河桥老桥的灌注桩水下拆除为例,结合现场实际情况,经过多个方案的比选,确定了最优的施工方案,并详细介绍采用套箱法拆除航道中水下灌注桩的施工过程.