Application of Plasma Ignition Device in the 328 MW Boiler of Dagang Power Plant
Author(s): 
Pages: 20-23
Year: Issue:  5
Journal: ELECTRICAL EQUIPMENT

Keyword:  发电厂等离子点火亚临界锅炉无油启动正反切圆燃烧;
Abstract: 大港发电厂一期2×328.2 MW发电机组油改煤工程中,安装了等离子点火装置.文章介绍了等离子点火系统的原理和等离子燃烧器的结构;详细阐述了等离子点火系统在328 MW切圆燃烧锅炉的使用情况,包括等离子系统的启动、磨煤机的调节、运行中发现的问题和解决的方法;分析了等离子点火装置应用的经济效益,1号炉168 h试运,总共用油仅200t,节省燃油2 800t,节约调试费用约1 200万元;冷态启动机组时轻柴油用量从原来的100t减到不足5 t.