Technical Reconstruction of Hydraulic Turbine Generator Units in the Second Cascade Power Station on the Gutianxi
Author(s): 
Pages: 14-16,20
Year: Issue:  1
Journal: JOURNAL OF NORTHWEST HYDROELECTRIC POWER

Keyword:  水轮机发电机转轮气蚀技术改造;
Abstract: 介绍了古田溪水力发电厂二级电站两台水轮发电机组的技术改造,解决了气蚀、振动及设备老化等安全性能问题,达到预期效果,并获得较大的经济和社会效益.